almost ready!

the carpets down, the walls are painted the shower, loo and radiators are all working (the sink ent yet!)













the whole extention is looking like it will be ready to move into as soon as B get (if she is allowed) her new bed.

the new mural has even been sketched out oh exciting. IKEA has even met its mtach with this new extention with B new wardrobe and sensory desk being built in reocrd time (for me) with a few no bit what so ever left over!

















- this morning -
5AM woken to carol singing from BB
5.30 taken into mummy n daddys bed were she showed us how good she has got at rolling onto her tummy and laughing, which is a nice improvement from not liking being on her tummy.
6AM taken back to her bed and carol singing resumed!
6.10 snoring from BB's room
7.30 have to be woken up as turned into a grumpy teenager for some reason



Saturday 17 December 2011

Bedroom

Wow Bethany's new bedroom is decorated and looks amazing! so plsed!


Butterfly lampshade



Lilac walls 

Butterfly wallpaper



Wednesday 14 December 2011

walls painted and radiaters

The decorator has been in and started painting and the plumber has started to put radiators in and doing bathroom.

Painted ceiling

Storage area

New radiator

Bathroom radiator

towel rail and sink cupboard

Saturday 10 December 2011

Sensory wetroom changing colour lights

Blue

Orange

Green

Blue

Purple

Pink


Lilac

Wetroom floor is now down

The floor in the wetroom and storage bit was put down today looks amazing bathroom looks fab just need shower and loo and sink and will be finished!



Thursday 8 December 2011

Wetroom Tiles and new doors!

The Wetroom is now tiled and waiting to be grouted! the new sliding doors have gone up too!

one wall grouted

Shower area

New sliding doors

Not the glittery tiles i wanted but still nice :)

Wednesday 7 December 2011

Electrics and tiles

The lights, light switches and plug sockets have gone in and the bathroom has started to be tiled! Also the resin for the wet room floor has gone down ready for new floor on sat!
Sockets

Light and fire alarm

Bathroom lights

Tiles in the shower corner

Tiles in rest of wetroom

Saturday 3 December 2011

Leaving our mark

The inside has been drying out the skirting board has been put in and the path into garden has been concreted!
our names in path

Path into garden

wood for sliding doors

wooden skirting

Wednesday 30 November 2011

All plastered!

all the walls are plastered now and drying out! the path to the garden has been cleared ready for concrete too!
paths ready for concrete




Saturday 26 November 2011

2 more weeks to go!

Well this week the scaffolding has come down and we can now see the outside! and the inside has now been partly plastered!
View from garden

back door

Bethany's Bedroom

Bethany's bedroom